In Bella Vista, any improvement that changes the exterior appearance of a property needs approval from the POA's Architectural Control Committee before work starts, and the POA lists decks, fences, retaining walls and accessory structures as needing a city permit as well. Newer subdivisions elsewhere in Northwest Arkansas usually have recorded covenants with their own architectural committee and rules on fences, pools and outbuildings. Read yours and get approval in writing before anything is ordered.
01Why can one project need two approvals?
Because the city and the association are judging different things under different authority.
The city enforces building codes and its own ordinances: structure, safety, setbacks, drainage. A property owners association or homeowners association enforces private covenants that run with the land, which mostly concern appearance and use. Neither one checks the other's rules. It is entirely possible to have a valid city permit and still be in breach of your covenants, or to have the committee's blessing for a wall the city has not permitted.
The Oakbrooke covenants in Fayetteville, which we use as a worked example below, say it in one line: where city ordinances and the covenants conflict, the more restrictive provision wins.
02What does Bella Vista require?
Bella Vista is the clearest case in the region: the POA's Architectural Control Committee reviews exterior changes, and the city permits many of the same projects separately.
The Bella Vista POA publishes which authority covers which project. For outdoor work, the list reads like this.
| Project | ACC approval | City permit |
|---|---|---|
| Deck | Yes | Yes |
| Fence | Yes | Yes |
| Retaining wall | Yes | Yes |
| Accessory structure | Yes | Yes |
| Seawall | Yes | Yes |
| Dock or boat slip | Yes | Yes |
| Exterior repainting | Yes | No |
| Reroofing | Yes | No |
Patios are not named in that table, but the ACC's own application page states that any improvement that changes or maintains the exterior appearance of your home or property requires ACC approval before work begins. Treat a patio, pergola or outdoor kitchen as needing it. Our Bella Vista permit guide covers the city side in detail.
03How does the Bella Vista ACC process work?
On paper, in person or by post, with a colour application attached.
Outdoor projects go on the ACC's Miscellaneous Improvements Application. The ACC says every Miscellaneous Improvements application and change request must include a completed Color Application, and that applications without it will not be accepted. It does not currently accept applications online or by email; they are submitted in person at the ACC office or by mail. There is a separate form for changes to an approved permit, an extension form that adds 90 days to a permit nearing expiry, and a published fee schedule.
The ACC office is at 626 W. Lancashire Blvd, open Monday to Friday, 7:30 a.m. to 4 p.m., on (479) 855-8080. If the work needs access across POA common property, that is a separate permission from the POA itself, on (479) 855-8000. Checked September 2026.
04What about newer subdivisions in Bentonville, Rogers, Centerton and Fayetteville?
Most have recorded covenants, often called a bill of assurance, and many set up an architectural committee.
These are private rules the developer records with the plat at the county Circuit Clerk, and they bind every later owner. They vary enormously from one subdivision to the next, from a page of basics to detailed design codes. The only way to know what yours says is to read it: your closing documents or title policy should reference it, the HOA should be able to supply it, and the Circuit Clerk holds the recorded copy.
The names vary. Bella Vista's is a property owners association because it also owns and runs amenities, parks and lakes, with a separate committee for architecture. Many newer subdivisions have a homeowners association that maintains common areas and enforces the covenants itself. Some older ones have covenants and no active association at all, which does not make the covenants disappear. What binds you is the recorded document, whatever the body is called.
Look in particular for an architectural or design review clause, rules on fences, pools and outbuildings, setbacks stricter than the city's, and the easements shown on the plat.
05What does a real set of NWA covenants actually say?
Here is one recorded example, so you know the kind of clauses to look for. Yours will be different.
The Protective Covenants, Restrictions and Bill of Assurance for the Oakbrooke subdivision in Fayetteville set up the Oakbrooke Architectural Control Committee and include, among much else, the following.
| Topic | What the Oakbrooke covenants say |
|---|---|
| Review time | The committee has 10 business days to approve or require changes, and 10 business days again for each resubmission |
| Pools | Above-ground pools not permitted; in-ground pool design and fencing must first be approved |
| Privacy fences | No higher than four feet unless a variance is granted |
| Front yard fences | Decorative fences or landscape walls only, no more than 32 inches above finished grade |
| Outbuildings | No detached outbuildings without prior written consent; placed to the rear, inside a privacy fence |
| Easements | Structures, walls, fencing or plantings in an easement are subject to removal at the owner's expense |
| City rules | Where city ordinance and covenants conflict, the more restrictive applies |
| Liability | Approval is not a warranty of the plans, and the committee is not liable for its decisions |
06Why are easements the clause that bites?
Because an easement can sit in the middle of the garden you were planning to use, and the covenants can make you remove whatever you built on it.
Subdivision plats reserve strips for utilities and drainage, commonly along rear and side lot lines. The Oakbrooke covenants are typical in putting owners on notice that walls, fencing, paving or planting in an easement can be removed at the owner's expense. A retaining wall or an outdoor kitchen across a drainage easement is exactly the kind of thing that gets built without anyone checking the plat, and then has to come out when the utility or the association needs access. Check the plat before the design is final, not after.
07What does a committee usually want to see?
Enough to judge what it will look like and where it sits: a site plan, materials and colours.
Requirements differ, so read your own. As examples, the Bella Vista ACC requires a Color Application with every miscellaneous improvement, and the Oakbrooke covenants require plans, a plot plan showing orientation, the contractor, and proposed materials and colours for new construction. For a patio, wall or pergola, a scaled site plan showing the work against the property lines and easements, a material and colour list with product names, and elevations of any structure cover most of what committees ask for. Bring the covenants to the first site visit and the design can be drawn to them from the start.
08Does a committee really care about a back garden patio?
Often yes, because the covenant language usually covers the whole property, not just the street view.
The Bella Vista ACC's wording covers any improvement that changes or maintains the exterior appearance of your home or property. The Oakbrooke covenants require approval for any modification of the exterior of the home after the certificate of occupancy, including colour changes. A pergola that shows over a fence, a retaining wall on a visible slope or a pool with its fence is squarely what these clauses are for. Even where a flat patio behind the house seems unlikely to interest anyone, a written approval costs a form and a few days, and not having one can cost the structure.
09What should your contract say about approvals?
Who applies, what happens if the design changes, and that work does not start until approval is in writing.
Both documents we looked at treat changes as a new approval. Bella Vista has a separate form for changes to an approved permit, and the Oakbrooke covenants say revisions during construction are discouraged and must be approved. So if the design moves on site, say a wall gets taller or a material is swapped, the approval has to follow. A good contract names who prepares and submits the application, states that work starts only after written approval from every authority that applies, and says how a required change is handled and priced. That protects you and the contractor equally.
10How long does approval take?
It depends entirely on the association, so build the review into the schedule.
Where covenants set a deadline, as Oakbrooke's 10 business days per submission does, you can plan around it; two rounds of comments turn that into a month. We did not find a published review time on the Bella Vista POA pages we checked, so ask the ACC when you submit. For a spring build, the application wants to go in during the winter, while design is being finalised, not the week before the crew is booked.
11What if the committee says no, or does not answer?
Ask for the reason in writing, check it against the covenants, and revise.
Most refusals are about something specific: a colour, a height, a fence style, a structure in a setback. A revised design that addresses the stated reason is usually the fastest route. What your covenants say about a committee that fails to respond varies, and so does what they say about appeals, so read that clause before assuming silence is consent. For a genuine dispute over what a covenant means, that is a question for a real estate attorney, not for a contractor.
Projects with us start around seven and a half thousand dollars. Francisco Gallardo, the owner, walks the ground himself before any number is given, because on this geology the number depends on what is under the turf. The visit costs nothing. Financing is available through Acorn Finance. Call (479) 379-2226 or send the project form.
FAQCommon questions
Do I need POA approval for a patio in Bella Vista?
Treat it as yes. The ACC states that any improvement changing the exterior appearance of a property needs its approval before work begins. Call the ACC on (479) 855-8080.
Can I submit a Bella Vista ACC application online?
Not currently. The ACC accepts applications in person at 626 W. Lancashire Blvd or by mail, and each must include a completed Color Application.
Does a retaining wall in Bella Vista need both approvals?
Yes. The Bella Vista POA lists retaining walls as needing ACC approval and a city permit.
Where do I find my subdivision's covenants in Northwest Arkansas?
Your closing documents, your HOA, or the county Circuit Clerk, where covenants and bills of assurance are recorded with the plat.
Can my HOA stop a project the city has permitted?
It can enforce its covenants separately. A city permit does not satisfy private covenants, and where they conflict the more restrictive rule usually applies.
Can I build a patio or wall on an easement?
Check the plat and your covenants first. Many covenants, including Oakbrooke's in Fayetteville, say anything built in an easement can be removed at the owner's expense.
How long does HOA approval take?
It varies. Oakbrooke's covenants give the committee 10 business days per submission. Ask your association and submit well before your build date.
How does HOA approval fit into a Gallardo Custom Builds project?
Share your covenants at the first site visit so the design is drawn to them from the start, and ask Paco then what the committee submission will need from each side.
REFSources
- Bella Vista POA: The City, POA and ACCbellavistapoa.com
- Bella Vista POA: ACC Governance Formsbellavistapoa.com
- Protective Covenants, Restrictions, Bill of Assurance for Oakbrooke Subdivision, Fayettevilleoakbrookenwa.com
NEXTGet it looked at properly
Everything above is general guidance. What your ground actually needs is a site visit, and ours costs nothing. Francisco Gallardo walks it, reads the grade and the drainage, and tells you what is possible.