Building While You Are Away: How Updates and Approvals Work if You Have Not Moved In Yet

Can a contractor build your patio while you are out of town? Yes, if decisions come first. What to settle, what the contract should say, what to ask a builder.

6 min readUpdated September 20263 sources
Short answer

Yes, a contractor can build your patio while you are out of town, as long as the design is settled before the dig and the contract says how you will be updated and how changes get approved. The hidden stages, such as excavation depth and the base, need photos because you cannot see them afterward. Pay by progress, never in full up front.

01Can a contractor build my patio while I am out of town?

Yes. Outdoor projects are often built for owners who are still packing up in another state, or away for work. It works when the decisions are made early and the communication is agreed in writing.

It is a common situation with relocations to Bentonville, Rogers, Cave Springs and Centerton. The house closes, one partner starts the new job, the family follows a few months later, and someone wants the backyard usable by the time everyone arrives. None of that is a problem in itself. What goes wrong is decisions that were never made, changes agreed by phone with nothing written down, and stages of work nobody saw before they were buried.

This guide is general practice, not a description of any one company's process. Use it as a list of questions to ask any builder you are considering, and that includes us.

02What has to be decided before we leave, or before work starts?

Everything you would otherwise decide by standing in the yard.

  • Layout, marked on the ground. Ask for the outline to be painted or staked and photographed from the back door, a window and the far corner, with a tape in shot. Approve that, not just a drawing.
  • Heights. Where the finished surface meets the door threshold, and how it falls away from the house.
  • Materials. Pick the actual paver, stone or finish, ideally from a physical sample shipped or left for you, with the product name written into the contract.
  • Utilities. Any sleeves, gas, power or lighting runs, decided before the base goes down.
  • Approvals. HOA sign-off and any permit, in hand before the start date. Our guide to HOA and POA approval explains what committees usually want.

If you are buying a newer build, read what to build first in a new build before fixing the layout, because the ground next to a new foundation changes what can go where.

03What should the contract say?

The Arkansas Attorney General's office publishes a short list, and it is a good floor.

Its home improvement guidance says to have a written and signed contract before any work begins, containing your name, the contractor's name, address and phone number, a complete and detailed description of the work and materials, a provision requiring your written approval before any price increase, the warranty, start and completion dates, the full cost and payment terms, and both signatures. It also warns against contractors who demand full payment before the job is complete.

For an owner who is away, add three things: how and how often you will be updated, who can approve a change on your behalf if anyone, and how a change is recorded. A text that says "go ahead" is an approval. A written change note with the price attached is a record.

04What should we ask any builder about updates and approvals?

These are the questions that separate a builder who can work with an absent owner from one who cannot.

Question to askWhy it mattersA good answer sounds like
Who will I actually talk to during the build?Messages lost between people cause most remote problemsOne named person, reachable by phone and text
How often will I get updates, and in what form?Silence is what makes absent owners anxiousA set rhythm, with photos at each stage
Which stages will you photograph before they are covered?You cannot inspect a base after the pavers are downExcavation depth, base lifts, footing holes, drainage before backfill
What happens if you hit rock or a surprise?In Benton County chert is common and quotes moveA stated rate or process, agreed in writing before work continues
How do changes get approved?Verbal changes turn into billing disputesA written change with a price, approved by you before the work
How are payments tied to progress?Paying ahead removes your leveragePayments linked to completed stages, final payment after the walkthrough
How will we do the final walkthrough?Punch lists get missed without oneA live video walk, or someone you trust on site, then a written list

05Which stages need photos, and what should they show?

The ones that disappear. On a patio or wall, most of the quality is buried by the end.

Ask for photos with a tape measure or a level visible, not just general progress shots:

  • Excavation, with a tape showing depth at a few points, and anything found, such as rock, soft spots or old fill.
  • Base, as it goes in, showing the stone and the compaction equipment. On clay and chert ground this is the part that decides whether the patio lasts. Our guide to patio base depth in Arkansas explains what to look for.
  • Drainage, before it is covered: pipe, fall and where it comes out.
  • Footings for any pergola or pavilion, with depth shown before the concrete goes in. See frost depth and footings.
  • Wall drainage, for a retaining wall: the drain pipe and clean stone behind the blocks before backfill.

A builder who does the work properly usually has no objection to showing it. A builder who resists photographing the base is telling you something.

06How should payments work when we are not there?

In stages, tied to work you can see in photos, with the last payment after the walkthrough.

A deposit to secure materials and a place in the schedule is normal. After that, pay as stages are completed and documented. The Attorney General's guidance is blunt about avoiding contractors who want full payment before the job is finished.

There is also an Arkansas-specific point about liens. On residential work, state law requires a notice to the owner, usually built into the contract, stating that every contractor, subcontractor, laborer and supplier on the job is entitled to a lien against the property if not paid in full, even if you have paid the full contract price to the contractor. For an owner who is away, the practical step is to ask, before the final payment, for confirmation that suppliers and subcontractors have been paid. It is a normal request and a good builder will not be offended by it.

07How do we check who we are hiring from a distance?

The same way you would locally, with a bit more paperwork.

Arkansas requires a contractor license for residential work on a single-family home over $2,000, labor and materials included, unless an exception applies. The Attorney General's office says you can contact the Arkansas Contractors Licensing Board at (501) 372-4661 to verify a license, the date it was issued and whether complaints have been filed. Ask for a certificate of insurance too, and for two or three recent local clients you can call. Look at finished work in person if anyone in the family is in town, or ask for addresses you can drive past later.

Our lists of questions to ask a hardscape contractor and how to read a quote cover the rest, and what turnkey should mean helps if you want one team to handle everything while you are away.

08What about the site itself while nobody is living there?

Sort out access, water, power and the neighbors before day one.

Crews need a gate code or key, somewhere to stage materials, and usually an outdoor tap and an outlet. Agree which, in writing. Tell the neighbors, and the HOA if it has rules on work hours or trucks. If sprinklers are running, find out where the lines and heads are so they can be marked. And agree what the site should look like at the end of each day, because nobody will be there to notice an open trench after a storm.

Weather is the other thing to plan for. Spring is the wettest part of the year here, and excavation and concrete stop when the ground is saturated or freezing. Ask how the builder tells you about a weather delay and whether the schedule in the contract allows for it, so a rained-out week reads as expected rather than as silence. Our guide to how long a patio takes covers realistic timelines.

09How does this work with Gallardo Custom Builds?

Ask Paco every question on this page. The answers should be specific.

Gallardo Custom Builds is owner-led: Francisco "Paco" Gallardo is the person you talk to and the person who walks the ground. That makes the first question in the table easy to answer, but the rest are worth asking anyway, of us or of anyone else you are considering. If you are comparing builders while you are still out of state, our guide to owner-led builders and design-build firms covers the difference.

Projects with Gallardo Custom Builds start around seven and a half thousand dollars. Francisco "Paco" Gallardo, the owner, walks the ground himself before any number is given, because in Northwest Arkansas the number depends on what is under the turf. Financing is available through Acorn Finance. Call (479) 379-2226 or send the project form.

FAQCommon questions

Can a contractor build my patio while I am out of town?

Yes, if the layout, heights, materials and approvals are settled before work starts, and the contract says how you will be updated and how changes are approved.

We are relocating to Bentonville and have not moved in yet. How do we approve the layout?

Ask for the outline to be painted or staked on the ground and photographed from the back door and a far corner with a tape in shot. Approve that, not only a drawing.

What photos should a contractor send during a patio build?

Excavation depth with a tape, the base going in and being compacted, drainage before it is covered and any footing holes before concrete. Those are the stages you cannot check later.

How much should I pay up front for a patio if I am not there?

A deposit is normal, then payments tied to documented stages, with the final payment after the walkthrough. The Arkansas Attorney General warns against paying in full before completion.

What is the lien notice in an Arkansas contract?

A required notice that subcontractors and suppliers can place a lien on the property if they are not paid, even if you paid the contractor in full. Ask for confirmation they have been paid before the final payment.

How do I check an Arkansas contractor from out of state?

Verify the license with the Arkansas Contractors Licensing Board, which the Attorney General lists at (501) 372-4661, ask for insurance certificates and call recent local clients.

How do we do the final walkthrough remotely?

A live video walk of every edge, joint and drain, then a written punch list, with the last payment held until it is done. Better still, have someone you trust on site.

REFSources

  1. Arkansas Attorney General: Home Improvementsarkansasag.gov
  2. Arkansas Department of Labor and Licensing: Apply for a Contractors License or Registrationlabor.arkansas.gov
  3. Lorman Education Services: Construction Lien Law in Arkansas (Ark. Code Ann. 18-44-115 owner notice)lorman.com

NEXTGet it looked at properly

Everything above is general guidance. What your ground actually needs is a site visit, and ours costs nothing. Francisco Gallardo walks it, reads the grade and the drainage, and tells you what is possible.

Free on-site design visit

Let's walk your yard together.